Free SWMS template for Queensland, and what it has to include

A SWMS (safe work method statement) is required in Queensland before any high-risk construction work starts. Get a free editable template, see what the law says it must contain, and use the worked example to fill it in properly the first time.

4-page editable PDFCover · Job and business details with a high-risk work checklist · Hazards & controls table · Consultation & review sign-off

No spam. One email now with the template, and one follow-up in 5 days. Unsubscribe anytime.

When you need a SWMS in Queensland

Before high-risk construction work starts, the business doing it must make sure a SWMS has been prepared, either by itself or by someone else (WHS Regulation 2011 (Qld), s299(1)).

High-risk construction work is construction work that involves any of these 18 types of work (s291):

  1. A risk of a person falling more than 2 m
  2. Work on a telecommunication tower
  3. Demolishing a load-bearing or structural element
  4. Disturbing, or likely disturbing, asbestos
  5. Structural alterations or repairs that need temporary support to prevent collapse
  6. Work in or near a confined space
  7. Work in or near a shaft or trench deeper than 1.5 m, or a tunnel
  8. Use of explosives
  9. Work on or near pressurised gas mains or piping
  10. Work on or near chemical, fuel or refrigerant lines
  11. Work on or near energised electrical installations or services
  12. Work in an area that may have a contaminated or flammable atmosphere
  13. Tilt-up or precast concrete
  14. Work on, in or next to a road, railway, shipping lane or other traffic corridor in use by traffic other than pedestrians
  15. Work in an area where powered mobile plant is moving
  16. Work in an area with artificial extremes of temperature
  17. Work in or near water or other liquid with a risk of drowning
  18. Diving work

If your job doesn’t involve any of these, the law doesn’t require a SWMS. You still have to manage the risks, though, and your principal contractor may ask for one anyway.

What a Queensland SWMS must contain

Section 299(2) says a SWMS must:

  • Identify the work that is high-risk construction work. Name the category or categories from the list above and describe the actual task.
  • State the hazards and the risks to health and safety. Describe the specific hazards on this job, not hazards in general.
  • Describe the control measures. Say exactly what will be done to control each risk.
  • Describe how the controls will be put in place, monitored and reviewed. Say who checks, when they check, and what happens if conditions change.

Section 299(3) also says the SWMS must take into account the conditions at the workplace and, on a construction project, the principal contractor’s WHS management plan. It must be written so the people using it can easily read and understand it.

What WorkSafe Queensland says it should also include

WorkSafe Queensland’s SWMS guide says a SWMS should also include:

  • Your business name, address and ABN
  • The person or people responsible for putting the SWMS in place, monitoring it and making sure it’s followed
  • On a construction project: the principal contractor’s name, the site address, the date the SWMS was prepared, the date it was given to the principal contractor, and any review date

It may also include the names of workers consulted, the consultation date and their signatures.

The most common reason a SWMS gets sent back

The controls are too vague. WorkSafe’s guide uses “use appropriate PPE” as an example of a control that doesn’t actually describe anything. A SWMS should tell the crew exactly what to do, so supervisors and workers aren’t left to decide the controls themselves on the day.

Worked example: one row of the hazards and controls table

This is an illustration of the level of detail to aim for, not a ready-made SWMS. Your hazards and controls must match your own job and site.

TaskReplace box gutter on single-storey commercial roof, approx. 4 m to ground
High-risk work types291(a): risk of a person falling more than 2 m
HazardUnprotected roof edge along the gutter line; fragile skylight sheets near the work area
RiskWorker falls from the roof edge or through a skylight, causing serious injury or death
ControlsEdge protection installed along the work edge by a competent person before roof access. Skylights covered or meshed and marked before work starts. Single designated access point from a secured ladder or scaffold stair. Exclusion zone at ground level below the work area.
Who checks and whenLeading hand inspects edge protection and skylight covers before first access each day and records it on the job. Work stops if any protection is removed or damaged.
Review triggerChange in roof access, weather affecting the roof surface, or any change to edge protection

Before work starts: give it to the principal contractor

On a construction project, the SWMS must be given to the principal contractor before the high-risk construction work starts (s301). WorkSafe Queensland says the work must not start until the principal contractor has a copy.

Following, reviewing and keeping your SWMS

Follow it. You must have arrangements in place to make sure the work is done the way the SWMS says. If the work isn’t being done that way, stop it immediately or as soon as it’s safe, and only start again once it can be done in line with the SWMS (s300).

Review it. If the control measures for the work are revised, the SWMS must be reviewed and revised where necessary (s302). When you change it, tell everyone involved, explain how they can get the updated version, and on a construction project give a copy to the principal contractor.

Keep it. Keep a copy until the high-risk construction work is finished. If a notifiable incident happens in connection with the work, keep it for at least 2 years after the incident (s303). WorkSafe recommends keeping every version if it’s revised.

Make it available. Workers doing the work must be able to get to it easily, and it must be available for inspection (s303). The crew doesn’t each need their own copy, but they do need to know and understand the hazards and controls.

Consult the crew. Workers, and their health and safety representatives, should be consulted when the SWMS is prepared. If the workers haven’t been engaged yet, consult them when the SWMS is first given to them, for example at induction or in a toolbox talk.

Frequently asked questions

Is a SWMS mandatory in Queensland?

Yes, for high-risk construction work. Under s299 of the WHS Regulation 2011 (Qld), a SWMS must be prepared before any of the 18 types of high-risk construction work starts.

Who should prepare the SWMS?

The business doing the work, in consultation with the workers who'll carry it out. WorkSafe Queensland says that business is usually best placed because it knows the work and the crew. A SWMS can also be prepared by someone else, but the business doing the work stays responsible for it.

Can I use a free SWMS template?

Yes. The law sets out what a SWMS must contain, not what format it has to be in. A template is only a starting point, though. The hazards and controls must describe your task on your site.

Will this template satisfy my principal contractor?

Not necessarily. Many principal contractors have their own SWMS format or extra requirements. Check what yours needs before you start.

How often should a SWMS be reviewed?

Whenever the control measures for the work are revised, and when conditions on site change. WorkSafe Queensland also recommends reviewing it regularly to make sure it still works.

How long do I need to keep a SWMS?

Until the high-risk construction work is finished, or for at least 2 years after a notifiable incident connected with the work.

Does a signed SWMS mean the job is safe?

No. A SWMS records the plan and shows the crew has seen it. The controls still need to be in place and checked on site.

Doing SWMS on your phone instead

If you write SWMS regularly, Sitepack lets you describe the job on your phone and turns that into a draft SWMS. You then review the hazards, controls and high-risk work categories before you use it. Once it’s ready, you can share a PDF, have the crew sign on through a link or QR code, and keep the SWMS and sign-on records together on the job.

Sitepack helps with drafting and record-keeping. It doesn’t guarantee compliance or replace a competent person’s review.

Sources: Work Health and Safety Regulation 2011 (Qld), ss291, 299–303 · WorkSafe Queensland: Safe work method statements
General information only, not legal advice. Last checked against the current Queensland regulation: October 2026.